09-04-2019, 04:47 AM
I just bought a house in HPP that was finaled in 2017.The permit called for a solar hot water system but it was built with a huge on demand system.
I wrote to the building dept to ask why the variance was allowed in an area with ample sunshine.
So far no reply.
Seems to me the variances were being abused and now they have gone the opposite way.
I wrote to the building dept to ask why the variance was allowed in an area with ample sunshine.
So far no reply.
Seems to me the variances were being abused and now they have gone the opposite way.