01-19-2024, 03:53 PM
in less than 24 hours crews, equipment and materials were able to be brought in to repave a major section of the runway
------
There are multiple contractors with the right equipment, located all over the island. Not sure which contractor they used but it wouldn't surprise me if the airport had a company or two "always ready".
------
There are multiple contractors with the right equipment, located all over the island. Not sure which contractor they used but it wouldn't surprise me if the airport had a company or two "always ready".