09-20-2007, 10:16 AM
Yes, I was thinking the same thing. Instead of bulldozing the lot, I was thinking about bringing in cinder to level the areas I wanted level. Anyone do this before? Is it less costly?
Need some one to pound holes in lava
|
« Next Oldest | Next Newest »
|