10-14-2007, 08:37 AM
One of my clients is doing a dodecahedron near South Point. Because of the design - it basically has about 4 lengths of lumber and about 4-6 different metal connectors. The gentleman putting it together says the last one he did, he had the frame together in less than 2 days by himself. This one is going to be rather large.