11-20-2008, 03:41 AM
Does anyone know what the present time frame is for a building permit. The septic is engineered, in and inspected, permit was applied for on tuesday. Is their a walk through process that could push things along, or better to wait? Thanks, Gordon.
Gordon J Tilley