07-13-2008, 08:58 AM
Right, and if your place was surveyed, all permits in, it would be great. But when you come to a new lot, and want to feel the place, not really sure where to put the house and don't want two random holes in the forest just to be legal. The alternative is plowing it clear, then it won't matter where you place it.
I'm starting with a self contained camper, but at considerable expense. A month or so on the lot ought to let you get set up to build. Another reason for a cess/septic first is logistics to access the area, and possibily blast.
I'm starting with a self contained camper, but at considerable expense. A month or so on the lot ought to let you get set up to build. Another reason for a cess/septic first is logistics to access the area, and possibily blast.
Gordon J Tilley