09-09-2008, 09:31 AM
Actually it wasn't very dumb use of money.I spoke to someone from DPW. They had send someone up there every week to fill in the potholes. The 6(5) phase is only between m.m 35-41.5. It should be completed by the summer of 2009. The last west side segment between m.m 41.5 Mamalahoa highway may take much longer.