03-05-2011, 05:50 AM
Anyone have experience pouring or having a concrete driveway poured? I am specifically wondering about the need for stress joints in a driveway on a slope and is about 80x10'. Do there have to be joints or at least scored lines? How often? How deep? Is it standard practice to do this?