05-10-2009, 04:40 AM
Why dont they just pave one of( or several of )the existing cross streets- bing done no problem, instead of getting into 100 ugly eminent domain cases, the one on the west side has been going on close to a decade and may end up in Supreme Court.
the plans for a pmar that come out of public works always have some way to try to not let hpp residents use the road( like running the road thru lots and gating it )
Railroad is like 4 lanes wide on the hilo side till it stops at shipman. Run it to shower drive- pave shower from 130 to the pmar, they are allready going to put a lite at 130 and shower.pave several cross road to disperse the load.then pave the old railroad and or old goverment beach rd. from makuu to Hawaiian beaches
the plans for a pmar that come out of public works always have some way to try to not let hpp residents use the road( like running the road thru lots and gating it )
Railroad is like 4 lanes wide on the hilo side till it stops at shipman. Run it to shower drive- pave shower from 130 to the pmar, they are allready going to put a lite at 130 and shower.pave several cross road to disperse the load.then pave the old railroad and or old goverment beach rd. from makuu to Hawaiian beaches