12-31-2009, 08:50 AM
I may be wrong & don't wanna look this up, & know that some on the forum know this:
Doesn't the design of the structure also have to be stamped,or can an OB do their own design & submit it, in order to get a permit? If so, one more trade....
Doesn't the design of the structure also have to be stamped,or can an OB do their own design & submit it, in order to get a permit? If so, one more trade....