Speed Trap on 130 today
#1
Lots of policemen chatting with unhappy motorists just south of the Keaau school.
Reply
#2
When speed limits are set to unreasonable limits - this happens.
Reply
#3
What is the speed limit between the light at the south end of Keaau and the transfer station?

It changes in that section several times...last time i noticed
Reply
#4
It should be 55, but then I think most speed limits are too low
Reply
#5
quote:
Originally posted by bluesboy

It should be 55, but then I think most speed limits are too low


It's posted as 45 but just before the transfer station headed Hilo way it says reduced speed, 45. So reduced from 45 to 45? \ From Shower to Maku'u it's dangerous and residential and I'm glad it's now 45.
Reply
#6
From Shower to Maku'u it's dangerous and residential

Not really -- County needs to rezone all that property RS, then drop the speed limit to 35.
Reply
#7
Get ready for Phase II of the shoulder widening project, paving starting up next week. This could mean more big traffic jams again for awhile.

"Aloha also means goodbye. Aloha!"
*Japanese tourist on bus through Pahoa, "Is this still America?*
Reply
#8
Does anybody know more about this phase II paving and can post here?
Reply
#9
There appears to be some shoulder widening already in progress.

All I can find is this 2011 KPAG "Elements of the Preferred Alternative", which says

Eight Bus Pullouts at:
· Shower/Pohaku Drives
· Kaloli Drive
· Pohaku Circle
· Orchidland Drive
· Paradise Drive
· Makuu Drive
· Ainaloa Boulevard
· Makuu Farmer's Market

Signals at five intersections:
·Shower/Pohaku Drives
(signal already committed in Shoulder Improvements project)
·Kaloli Drive
·Orchidland Drive
·Makuu Drive
·Pahoa Kapoho Road (signal already in place)

Roundabouts are proposed for the first phases of construction at:
·Ainaloa Boulevard
·Old Pahoa Road
·Kahakai Boulevard

This map clearly shows "Phases" but no "dates":

http://www.hawaiicountycdp.info/puna-cdp...ect/100915 KP Rd Alt 4 Phasing.pdf/view

Reply
#10
Phase II is the installation of a traffic light at Shower intersection. No start date set.