I am about to contract on a place that currently has no electric. These costs related to connecting electric are high.
My realtor said that the hookup fee is $995 for this lot, poles would be $3000 a piece for 100 amp service and $7000 piece for 200 amp service. There are currently 2 telephone poles leading to the house , so I assume , we would need at least 2 elec.poles.
Is there some other way ?
Posts: 2,314
Threads: 59
Joined: Jun 2003
With all due respect to your REALTOR, I would call the Engineering Department of HELCO.
Aloha,
John S. Rabi, ABR,CM,CRB,FHS,PB,RB
http://www.JohnRabi.com
Typically Tropical Properties
75-5870 Walua Road, Suite 101
Kailua-Kona, HI 96740
(808)327-3185
Posts: 186
Threads: 21
Joined: Aug 2005
Listen to John R's advice!
Posts: 186
Threads: 21
Joined: Aug 2005
PS - You might want to get HELCO to put the cost in writing.
Posts: 2,014
Threads: 46
Joined: Jun 2003
At those prices, you might want to seriously investigate off grid options. I doubt that after hookup, the monthly Helco charges will ever decrease.
David
Ninole Resident
Ninole Resident
Posts: 4,533
Threads: 241
Joined: Jan 2006
I agree with John - call Helco - then call Delima Drilling. I believe they might run just a TAD bit cheaper.... by a mile...
or
when your site work is being done - put the box at the street and trench for underground lines....
-Cat
Edited by - kapohocat on 09/15/2006 14:50:38
Posts: 45
Threads: 1
Joined: Jan 2006
Would love to go underground from the pole at the street to the house and shop/garage (eventually when we can actually START building <sigh>).
About what is the per foot charge for trenching? Done by HELCO or when we grade the lot/do the septic? Will HELCO then come out and lay the conduit or whatever?
Thanks, Linda
Posts: 4,533
Threads: 241
Joined: Jan 2006
My advice is keep HELCO out of the picture except to swing your line from the transformer to the box (at the street).
IMHO, when HELCO goes to do "construction/site work" they rape and pillage on cost...
As for trenching, call any of the site guys with an excavator/track hoe (or something that will work) with a "thumb" and ask cost to trench xxx linear feet... they should be able to ball park it.
Catherine Dumond
Blue Water Project Management
808 217-7578
http://bluewaterpm.125mb.com/index.html
"We help make building your dream home a reality"
Edited by - kapohocat on 09/16/2006 15:06:06
Posts: 548
Threads: 114
Joined: Jun 2005
My husband is backhoe operator for a contractor and they dig ditches...you could call him. Ken is his bosses name: 345-7197
Posts: 186
Threads: 21
Joined: Aug 2005
Cat - I had to laugh at your Helco comment. I have driven by Helco crews at work and am sometimes amazed to see how many workers are there doing nothing. It is bad enough when that is on a job at something like a power substation where the cost is split between all Helco customers. But it would be a rude shock to see that happen where the job was being billed to one party. Don't know that happens. But little here surprises me any more.