The official start of the Pahoa Roundabout detour starts today, and will be the only option 24/7 through May, or likely longer. I wonder if the County might open up Railroad to alleviate some of the bottleneck and daily six month grind of this? Let's be the squeaky wheel on this and put on pressure to open our taxpayer improved Railroad route!
Posts: 1,217
Threads: 18
Joined: Jan 2014
Going to call Greggor and Uncle Billy when they open today.
Posts: 11,051
Threads: 753
Joined: Sep 2012
The official start of the Pahoa Roundabout detour starts today...I wonder if the County might open up Railroad to alleviate some of the bottleneck
Good idea Kiana. Railroad Ave cost millions to build, why not use it for a few months?. As a temporary additional route while the roundabout is under construction, it wouldn't create the same problems that a full time, full load lava route would have caused such as a substantial traffic increase in HPP and regular grading and upkeep of the cinder surface.
Instead of 100% of the Hwy 130 traffic, as a secondary alternate route Railroad Ave might only carry 20-30% of the load (my best guess based on nothing), but 20-30% fewer vehicles on the Pahoa detour would result in a substantial reduction in traffic backups, especially in the morning and evening.
"I'm at that stage in life where I stay out of discussions. Even if you say 1+1=5, you're right - have fun." - Keanu Reeves
Posts: 14,121
Threads: 424
Joined: Aug 2012
Railroad Ave cost millions to build, why not use it for a few months?
Paid for with bond debt, so we're still paying for it.
"Please, County, can we use this thing we're paying for? Pretty please?"
Wondering what impact this will have on Pahoa businesses -- maybe HTH will investigate, then publish the results after the roundabout is complete and the news is no longer current.
Posts: 1,858
Threads: 46
Joined: Apr 2015
quote:
Originally posted by pahoated
It's in the tribune today. Estimate is June completion. One thing around here, asphalt can't be laid when it is pouring down rain. That extends completion estimate dates.
http://www.hawaiitribune-herald.com/news...ut-project
"Aloha also means goodbye. Aloha!"
If 'they' say June - read December. A whole year round the sun whilst we watch the Icy boys play with the roundabout...
Posts: 1,059
Threads: 97
Joined: Mar 2009
The article says "located at the intersection of Highway 130 and Highway 11" -- um, what?
Posts: 11,051
Threads: 753
Joined: Sep 2012
denied by tyrants and dictators!
a matter of life, death and national security!
Punatic Paranoid Persnickety Pundit thing!
Malihini Meltdown?
"I'm at that stage in life where I stay out of discussions. Even if you say 1+1=5, you're right - have fun." - Keanu Reeves
Posts: 7,743
Threads: 686
Joined: Jun 2011
The US military can put a bridge over a river in 24 hours but it takes 9 months to make an asphalt circle?
Posts: 1,219
Threads: 52
Joined: Dec 2014
quote:
Originally posted by Kiana
The official start of the Pahoa Roundabout detour starts today, and will be the only option 24/7 through May, or likely longer. I wonder if the County might open up Railroad to alleviate some of the bottleneck and daily six month grind of this? Let's be the squeaky wheel on this and put on pressure to open our taxpayer improved Railroad route!
So are you then volunteering to step up and pay the residents of HPP for the wear and tear on their privately owned and maintained roads you think should be available to to save you a little aggravation with a teeny tiny little detour?
If the county had taken over Maku'u and the cross streets everyone is going to want to drive on, because getting onto the highway at Maku'u during rush hour is an exercise in futility, you wanting to use HPP roads to avoid the detour might make sense, but they didn't, so what you are asking for is free use of private property to make your drive about 5 minutes shorter.
Posts: 14,121
Threads: 424
Joined: Aug 2012
free use of private property to make your drive
Same as it ever was.