10-13-2013, 02:14 PM
hi jlgerk, i already paid for the lot so im not including that. the contractor is me so im not including that either.
the way i figure 105 is my cost out the door.
the doc is in...
the way i figure 105 is my cost out the door.
the doc is in...
the doc is in...